Argyle Diamond Mine, Kimberley, Australia
The Argyle mine
located
Kimberley region
north-east
Western Australia
world's largest single producer
diamonds.
mine lies
550km south-west
Darwin
air.
region
remote
rugged
hot
temperatures
40°C
wet season
October
March.
SBM VSI5X Impact Crusher, VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher
When production
1985
workforce
Perth-based
operating
two-week 'fly-in
fly-out' basis – requiring
construction
camp infrastructure
support
operation.
recent years
however
programme
localisation
underway
workers
Kimberley.
Argyle
operated
Argyle Diamond Mines Joint Venture
wholly owned
Rio Tinto
2002.
initial
lease expired
2004
renewed.
SBM VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher
In September 2010
Rio Tinto announced
investment
$803m
project.
used
ramp-up
underground block cave
extend
mine's
2019.
mine
fully operational
2013.
Geology
reserves
mine processed 9.0Mt
lamproite
recover
total
30.5Mct."The discovery
Argyle orebody marked
commercial diamond occurrence
identified
not hosted
kimberlite.
AK1 pipe
Argyle instead consists
olivine lamproite
diamonds
eroded
placer (alluvial) deposits nearby.
SBM PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher
The deposit
discovered
1979
Ashton joint venture
following
12 years
exploration
various companies
area.
discovery
alluvial diamonds led directly
source
AK1 pipe.
At
2009
total measured
indicated
inferred resources
AK1 pipe
40Mt
grade
3.6ct/t. Proven
probable reserves (including
pit
underground) totalled 85Mt grading 2.1ct/t
containing 178Mct.
Mine development
Development
Argyle
two-stage process. Alluvial diamond
1983
1985
AK1 pipe
into production.
then
principal source
ore
supported
lesser amounts
alluvial material.
SBM JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher
Argyle operates
conventional open-pit mine
lamproite
waste
being drilled
blasted
being loaded
shovel-and-truck operation.
mine operates Bucyrus
P&H
Tamrock Driltech rotary drill rigs
O&K RH 200 hydraulic excavators
fleet
Caterpillar 789B
Rig MT4400 haul trucks
supported
Caterpillar
loaders
bulldozers
ancillary equipment.
mine operation
monitored
vehicle movements
controlled using Modular
Systems' dispatch system
uses
global positioning system (GPS)
accurate location
drills
plant. Contract
used
alluvial ores.
SBM Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher
Much
waste
highly abrasive quartzite
Argyle
long-term user
Skega dump
system
its haul truck fleet.
uses
suspended
reinforced rubber liner
conventional steel plating
hauler body.
Ore processing
Argyle's processing
uses
crushing
screening
heavy-medium separation (HMS)
X-ray sorter diamond recovery flowsheet. 3mm
forms
feed
heavy-medium separation circuit
-1mm material
rejected
tailings.
SBM Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher
Two-stage heavy medium cyclones
specific gravity
3.0
heart
separation process
material denser
forming
diamond-bearing concentrate. X-ray sorting separates
diamonds
residual waste
HMS concentrate
recovered stones being acid washed
sorting
shipment.
Production
Since coming into operation
Argyle
produced
670Mct
diamonds
average stripping ratio
pit
around 7t
waste being moved
tonne
mined. Peak production
1994
42.8Mct.
pit
lack
manoeuvrability
bottom
hinder
operations.
SBM Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher
In 2009
mine produced 10.5Mct
diamonds.
mine
produces
volume
world's pink diamonds.
The future
The company
expected
lamproite 'pipe' narrows
continues
greater depth
making continued access
methods uneconomic.
2001
company
looking
option
developing
underground mine – launching
pre-feasibility
investigate
alternatives
transition strategies.
SBM Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher, Multi-Crushing Mobile Crusher
The results
led
2003
approval
funding
feasibility
block cave underground mine
construction
exploratory decline.
completed
2005
December
decision
ahead
underground mine.
produces
90%
95%
world's pink diamonds."Work
A$1.6bn development
schedule.
January 2009
however
Macmahon Holding
primary
contractor
Argyle Diamond
site
announced
underground diamond
activities
slowed due
global economic downturn.
SBM Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher, Multi-Crushing Mobile Crusher,
Production capacity
predicted
average around 20Mct/y
compared
current long-term average
34Mct/y.
In addition
shift
underground working
company
process
localising
its workforce
Kimberley
aiming
80% based
2010 –
Aboriginal.
forms
major corporate step-change
described
'reassessing Argyle's relationship
mines'.
Relative Mining Project
- White Dam Gold Mine, Australia
- Kanowna Belle Gold Mine, Kalgoorlie, Australia
- Boddington Gold Mine, Perth, Australia
- Challenger Gold Mine, Australia
- Baralaba Coal Mine, Australia
- Curragh Mine, Australia
- Coppabella Coal Mine, Mackay, Australia
- McArthur River Mine, Northern Territory, Australia
- George Fisher Lead, Zinc and Silver Mine, Queensland, Australia
- Debswana Diamond Mines, Botswana
- Charters Towers Gold Mine, Queensland, Australia
- Cannington Silver and Lead Mine, Queensland, Australia
- Mount Isa Copper Mine, Queensland, Australia
- Ekati Diamond Mine, Northwest Territories, Canada
- Aldiss-Randalls Gold Project, Australia