SBM Mission
What we do today is to ensure the future of our group with youth and spirit forever and ever..
Crusher List
Contact information
SBM MachineryNo.416 Jianye Road,South Jinqiao Area,Pudong, Shanghai, China
E-mail: mill@ unisbm.net
Tel.: 086-021-58383022
Fax.: 086-021-58383058
Bachelor Lake Gold Mine, Canada
Bachelor Lake
Mine
located 225km north-east
Val-d'Or
Quebec
Canada.
consists
177 claims
concessions spread across 4,837.4ha
land.
mine
blocks:
eastern block (Bachelor Lake claims)
western block (Hewfran claims).
SBM VSI5X Impact Crusher, VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher
The eastern block
spread across 1,867.3ha
consists
51 claims
concessions.
western block
38 claims covering 683.5ha
Bachelor Lake Joint Venture (BLJV)
acquire 100%
Aur Resources Inc (Aur).
BLJV
76 claims spread across 1,975.3ha (MJL claims)
12 claims covering 311.3ha (Hansen claims) adjacent
Bachelor Lake property.
In November 2004 Metanor Resources Inc (Metanor) acquired
rights
Bachelor Lake
Campbell Resources (Campbell)
$2.3m. Metanor increased
capacity
mill
Bachelor Lake
expansion undertaken
2008. Production
mine exceeded 20,000oz
February 2009.
company
plans
Hewfran section
proven reserves
levels seven
eight.
SBM VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher
Geology
"Production
mine exceeded 20,000oz
February 2009."The mine
located
elevation
100m
covered
coarse
sandy glacial deposits.
mine lies
Chibougamau-Chapais greenstone belt
Abitibi geological sub-province
Superior Structural Province. Key
deposits
region include
Agnico-Eagle (Telbel Mine)
Golden Hope (Estrades deposit)
Lac Shortt
mine (now closed)
Meston Lake
Mine
Gonzague Langlois Mine (Grevet).
SBM PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher
Bachelor Lake
post-ore fault systems:
Waconichi faults (WAC)
trending N050°
N070°
dipping 70°
south-east
faults (T faults)
trending N020°
N030°
dipping 80° north-west
vertical.
resource
structurally controlled quartz veins
identified:
Vein
Vein
B Vein.
Main Vein produces
90%
mine's
resources.
Vein
recognised
level nine
traced
level
and
representing
greatest potential
additional resources
B Vein
discovered
level 11
level 12. Bachelor Lake
deposits: Bachelor
Hewfran.
SBM JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher
Reserves
The total measured
indicated resources
mine
estimated
841,591 metric tons
grade
7.79g/t Au.
measured
indicated resources
Bachelor deposit includes 643,826 metric tons
grade
7.96g/t Au
Hewfran deposit includes 197,765 metric tons
grade
7.24g/t Au.
Of
inferred resources
Bachelor deposit includes 207,517 metric tons
grade
6.76g/t Au
Hewfran deposit includes 218,630 metric tons
grade
6.30g/t Au.
SBM Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher
Mineralisation
The key
resource
Bachelor Lake
gold.
associates
pyrite
correlates
pyrite content.
pyrite
spread across strongly altered rocks
fragmented
injected
quartz / carbonates veins
veinlets.
mine includes
hoist room
shaft
mill."In
mine
occurrences
gold
chalcopyrite
ilmenite
discovered
surface.
minerals
finely grained.
SBM Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher
The
silver materials
correlation
appearance (1:1)
deposits.
highest correlation
observed
1,919.6ft
1,924.2ft
0.631oz
0.574oz
silver.
Open-pit mining
The mine
operational
1967
produced 700,000t
zinc
silver.
1980s Bachelor Lake
mined using
underground method.
2005
drilled
mine
dewatered.
SBM Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher
Infrastructure
mine includes
infrastructure
hoist room
shaft house
mill (500t/day)
tailing pond
core shack.
three-compartment shaft provides access
mine
level seven
further access
provided
four-compartment shaft
level seven
level 12.
Access
Bachelor Lake's claims
Hewfran claims
provided
level four
level
level eight.
SBM Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher, Multi-Crushing Mobile Crusher
The 500t/day mill consists
frame
bins
hoist
compressor complex
substation.
underground mine
processing complex
tailing disposal area
office
warehouse
shop complex.
Expansion
After acquisition Metanor performed
advanced underground exploration programme
increase resources
mine.
programme lasted
12 months
focused
changing
hoist
deepening
shaft
developing drifting
underground drilling
bulk sampling.
underground exploration programme
increase resources."In April
July 2005
exploration
drilling programme
conducted
69 holes totalling 13,345.55m
drilled.
holes
40 intercepted resources
cut-off grade
3.43d/t Au
minimum horizontal width
1.5m
higher
eight holes
minimum horizontal width
6m
14 holes
minimum horizontal width
1.5m
higher
cut-off grade
10g/t Au.
SBM Cone Crusher Mobile Crusher, Impact Crusher Mobile Crusher, Multi-Crushing Mobile Crusher,
On level 12
fixed drill stations drilled
mine
azimuth drilling. Drill Station
drilled 6,854.55m
Drill Station
drilled 6,496m.
In 2007
feasibility
mill rehabilitation
production start-up
conducted. Following
studies
development potential
mine
established
35,000oz/y
40,000oz/y
least
years.
By December 2008
operating capacity
mill
increased
modifying
installing
motors.
February 2009
mill capacity
increased
800t/day
minimal cost.
Relative Mining Project
- Tartan Lake Gold Mine, Canada
- Snap Lake Mine, Canada
- Prosperity Gold Mine, Canada
- Isambara Gold Mine, Tanzania
- Campbell Gold Mine, Ontario, Canada
- Geita Gold Mine, Tanzania
- Obuasi Gold Mine, Ghana
- El Torno Gold Mine, Argentina
- Chassoul Gold Mine, Costa Rica
- Blyvoor Gold Mine, South Africa
- Bellekeno Silver Deposit, Canada
- Buffelsfontein Gold Mine, South Africa
- Kalgold Gold Mine, South Africa
- Bear Run Coal Mine, Indiana, USA
- Afton-Ajax Copper-Gold Project, Canada