SBM Mission
What we do today is to ensure the future of our group with youth and spirit forever and ever..
Crusher List
Contact information
SBM MachineryNo.416 Jianye Road,South Jinqiao Area,Pudong, Shanghai, China
E-mail: mill@ unisbm.net
Tel.: 086-021-58383022
Fax.: 086-021-58383058
Bajo de la Alumbrera Copper and Gold Mine, Argentina
The Bajo de la Alumbrera (Alumbrera) copper-gold mine
Argentina
owned
operated
Minera Alumbrera (MAA).
commenced commercial operation
February 1998.
mine
located
Catamarca province
1,100km
Buenos Aires
altitude
2,500m.
SBM VSI5X Impact Crusher, VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher
The Argentine state-
provincially-owned
company
Yacimientos Mineros de Agua de Dionisio (YMAD)
title
deposit
awarded
international tender
Alumbrera concession
International Musto Exploration
1992. Minera Alumbrera
formed
1994
MIM Holdings bought
50% operating interest.
1995
Ltd
Rio Algom acquired shares
International Musto
25% holding
MAA. Pre-production capital expenditure totalled $1.2bn
capital expenditures
1998
1999 financial years
$198m
$17m respectively. Royalty payments
Catamarca province commenced
1998. YMAD
earning 20%
net proceeds (before tax)
project capital plus
repaid.
In 2003
years
Rio Tinto acquired
Ltd
Billiton (now BHP Billiton) bought Rio Algom
companies sold
holdings
Canadian company
Wheaton
Minerals
MIM
acquired
Xstrata.
2005 Xstrata opened
office
Chile
initially
manage
Alumbrera
company's Las Bambas copper project
Peru.
SBM VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher
Geology
reserves
The Bajo de la Alumbrera deposit
classic copper-gold porphyry. Porphyritic dacite intrudes volcanic andesite
chalcopyrite being
copper mineral. Near-surface weathered material overlies primary sulphide.
June 2009
mine's reserve
totalled 338Mt proven grading 0.4% copper
0.39g/t
0.013% Molybdenum. plus 10Mt probable
reserves grading 0.33% copper
0.3g/t
0.015% Molybdenum.
Minign
processing
Xstrata Copper announced
US$165m project
raise
plant’s capacity
26Mt/y
40Mt/y."The
measures 1.8km
1.8km. Pre-stripping involved
removal
25Mt
initial strip ratio
1.4:1.
SBM PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher
conventional: drilling
machines
blasting
loading
Bucyrus 495-B shovels
43m³ buckets; haulage
50 Caterpillar 218t-capacity trucks;
support
LeTourneau L-1800 electric
wheeled loaders.
haul trucks arrived
2004.
The concentrator
initially designed
treat 80,000
85,000t/d
yielding 700,000t/y
copper concentrate. Design recovery rates
91%
copper
70%
gold.
Run-of-mine
handled
8,400t/h Svedala gyratory crusher
feeds
coarse
stockpile.
SAG
ball mills –
supplied
Svedala – supply
via sizing hydrocyclones
either
gold
gravity separation doré metal system
flotation section.
latter comprises 100m³
rougher cells
regrinding mill
Jameson cell cleaner
scavenger flotation.
SBM JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher
During 2001–02
concentrator capacity
expanded
30%
maintain metal-in-concentrate output
190,000t/y
copper
600,000oz/y
gold.
pebble
circuit
additional grinding capacity
installed.
In 2004
MAA commissioned
third flotation circuit
2005
Xstrata Copper announced
$15.5m expansion
raise
plant’s capacity
37Mt/y
40Mt/y
orde
Tucuman filtration
Cruz del Norte. Concentrates
pipelined 316km
thickening
63% solids
Cruz del Norte plant.
de-watering
Larox pressure filters
railed
Puerta Alumbrera
constructed
Krupp F?rdertechnik
Parana River.
expansion
commissioned
November 2006
35 days ahead
original schedule.
SBM Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher
A project
molybdenum flotation
approved
July 2006. Construction
completed
quarter
2007
cost
$16m.
besides
existing Alumbrera concentrator
produced its
molybdenum concentrate
quarter
2008.
Commissioning
molybdenum
2008.
2008
produced 450t
molybdenum.
July 2009
flotation circuit
commissioned.
SBM Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher
Production
Mining consistently reached target rates
quarter
1999.
calendar 2008 Alumbrera produced 28Mt
ore
grading
average
0.50% copper
0.55g/t gold..
operation treated 37Mt
156,893t
copper-in-concentrates
plus
total
60,484oz
doré
443,919oz
concentrate.
More
50%
concentrate
sold
long-term contracts
doré
refined
USA.
Relative Mining Project
- Doolgunna Copper Gold Mine, Australia
- El Torno Gold Mine, Argentina
- Batu Hijau Copper-Gold Mine, Indonesia
- Cerro Vanguardia Gold and Silver Mine, Argentina
- Gualcamayo Gold Mine, Argentina
- Baralaba Coal Mine, Australia
- Morenci Copper Mine, Arizona, USA
- Boliden Area Operations (BAO) Gold Mines, Sweden
- Collahuasi Copper Mine, Chile
- Bachelor Lake Gold Mine, Canada
- Bear Run Coal Mine, Indiana, USA
- Boddington Gold Mine, Perth, Australia
- Antamina Copper-Zinc Mine, Peru
- Buffelsfontein Gold Mine, South Africa
- Chassoul Gold Mine, Costa Rica