Boulby Potash Mine, United Kingdom
In
1960s
fertiliser demand growing
UK reliant
imported potash
ICI decided
reserves 40km
its Cleveland facilities
north-east England.
200ha mine site
Boulby
half-way
Tees estuary
Whitby.
SBM VSI5X Impact Crusher, VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher
design capacity
1.0Mt/y
potassium chloride (KCl) product
sufficient
maintain
55% UK market share
substantial export sales. Potash extraction requires
co-production
salt. Construction started
1969
delivered
1973.
potash
ship/road/rail terminal
constructed
Teesdock.
ICI formed Cleveland Potash Ltd (CPL)
joint venture
Anglo American
subsequently sold its stake
Anglo American.
2002
"non-core" business
sold
ICL Fertilizers
division
Israel Chemicals Ltd.
SBM VSI Impact Crusher, PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher
CPL
employs 828 people
integrated
Iberpotash
Spain
regional subsidiaries into ICL Fertilizers Europe
handles marketing
distribution
products. Dead
Works recovers potash products
Israel.
GEOLOGY
RESERVES
Boulby potash occurs
depths
1,200
1,500m
seam ranging
0–20m
averaging 7m
thickness. Within
permian evaporite sequence
sylvinite
comprises 35–45% sylvite (potash)
45–55% halite (salt)
plus impurities.
sedimentary strata
evaporites include
triassic Sherwood sandstone
contains brine
pressure.
SBM PE Jaw Crusher, JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher
situation restricted exploration drilling
and
depth involved
prevented underground exploration
trial mining. Consequently
planners
aware
stresses
dealt
not
extent
faulting
presence
pressurised gas
shaly parts
potash
sufficient
blow-outs
extraction. However
geology provides excellent conditions
Institute
Underground Sciences
undertake 'dark-matter' experiments.
MINING
Sinking
5.5m-diameter
1,150m-deep shafts
sandstone
achieved
freezing
grouting
shaft. Although
basic concept
roadway development
salt
access room-and-pillar potash panels
sound
determining
efficient
system proved difficult
not
1984
CPL reduced
costs sufficiently
achieve profitability.
SBM JCE Jaw Crusher, Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher
mid-1990s
output
stabilised
16,000t/d – 2.8Mt/y
production sections.
Institute
Underground Sciences
undertake 'dark-matter' experiments."To cope
greater stresses
below 1,200m
raise output
3Mt/y
2001
CPL converted its continuous miners
remote-controlled operation (so
safely used
shaly sections without prior blasting).
The mine
mine-wide digital micro-seismic monitoring system
devised
two-road
stubs (rather
four-road) stress-relieving room-and-pillar technique
achieves
per shift. Jeffrey
Joy continuous miners discharge
Joy electric shuttle cars
feeder breakers
conveyors
hoisting shaft.
ORE PROCESSING
CPL's refinery separates KCl
salt
sylvinite
recovers
potash
grades. Following impact
rod milling
de-sliming units feed underflow
salt
impurity removal
flotation
overflow
classified
treated
filtration
slime flotation.
de-watered
screened flotation
standard fertiliser-grade potash
converted
granular grade
compaction circuit.
SBM Symons Cone Crusher, Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher
The potash recovered
filtration
slime flotation
directed
crystallisers
normally yield
soluble potash product. Assisted
EU funding
CPL developed
system
pumping tailings / seawater slurry into worked-out areas
1km
core operation.
backfilling operation started
2003.
The fertiliser grades
sold
either
application
complex fertiliser manufacture
soluble potash
industrial applications
salt primarily
de-icing.
SBM Hydraulic Cone Crusher, Spring Cone Crusher, Jaw Crusher Mobile Crusher, Cone Crusher Mobile Crusher
PRODUCTION
Potash production rates
related
demand projections whilst salt output
roughly determined
development required
achieve
potash target.
1994
potash output
varied
800,000t
1.03Mt/y
salt production ranging
384,000t
662,000t. ICL indicated
CPL maintained production
2005
1Mt/y
potash
500,000t
salt.
Relative Mining Project
- Omagh Gold Project, United Kingdom
- Mulatos Mine, Mexico
- Dolores Mine, Chihuahua, Mexico
- Tapuli Mine, Sweden
- Kaltim Prima Coal Mine, Indonesia
- Cikoleang Gold Mine, Indonesia
- Cobre Panama Copper Mine, Panama
- Collahuasi Copper Mine, Chile
- Aurora Phosphate Mine, NC, USA
- Boliden Area Operations (BAO) Gold Mines, Sweden
- Cerro Colorado Copper Mine, Chile
- Bingham Canyon Copper Mine, UT, USA
- Anita Project Niobium-Tantalum Mine, Canada
- Coppabella Coal Mine, Mackay, Australia